Production Scheduling with Due Windows: -Flow Shop and Job Shop Cases

$61.00
by Shun Chi Yu

Shop Now
With related studies demonstrating that ant colony optimization algorithm (ACO), and particle swarm algorithm (PSO) are both effective and efficient means of solving scheduling problems, this study; develops a farness particle swarm optimization algorithm (FPSO) to solve reentrant two-stage multiprocessor flow shop scheduling problems in order to minimize earliness and tardiness, a novel effective ant colony optimization (EACO) algorithm to solve two-stage flexible flow shop scheduling problems and thereby minimize earliness, tardiness and makespan, and a wise select ant colony optimization (WSACO) utilizing due window and sequence dependent setup time for constraints in job shop scheduling.

Customer Reviews

No ratings. Be the first to rate

 customer ratings


How are ratings calculated?
To calculate the overall star rating and percentage breakdown by star, we don’t use a simple average. Instead, our system considers things like how recent a review is and if the reviewer bought the item on Amazon. It also analyzes reviews to verify trustworthiness.

Review This Product

Share your thoughts with other customers